The Innovative Group

Lake Street

This renovation started in the basement with the addition of 7 new 9″x 6″ Steel Channels and beams,carrying through to the main floor with the addition of a new 21′ x 11″ Steel beam. After all of the structure was re-supported, the house was raised in the center over 2.5″ to bring the main floor back to as level as possible. After all of the major structural  components and Completion of the Building Envelope was finished, this home was given back to the more than capable hands of the homeowner to add their personal touch!

Call Now ButtonCall Us Now